LAHomework Sign in
Chatsworth, CA 91311 · S Summit Ridge Cir

22355 S Summit Ridge Cir

Built 2003 · 6,203 sq ft
LOT 37,190 SQ FT · 1 STRUCTURE · APN 2727-022-041Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2003
Living area
6,203 sqft
Lot size
37,190 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
6
Home type
Single-family
Parcel (APN)
2727-022-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2023 to 2033From build year 2003
20262035
HVACWorth a look now
Usually done by 2023From build year 2003
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 29 homes on S Summit Ridge Cir →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileWater heater: Replace Water Heater
  • 2020
    permit on fileSolar: [Eplan] Pv1 Roof Mounted System. Socpe Of Work Includes: (33) Q Peak Modules, (33) P340 Optimizers, (1) Se10000H-Us Inverter That Is Connected To An Existing 200Msp. System Size: 11.22Kwdc (10.0 Kwac)New Main Breaker Derate To 175 Amp Shall Be Under Separate Permit.
  • 2020
    permit on fileSolar: 175 Amps Main Breaker Derate To Accommodate Solar Photovoltaic Installation.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2023
  • Now
    Roof replacementExpected 2023 to 2033