LAHomework Sign in
Los Angeles, CA 91311 · S Summit Ridge Cir

22354 S Summit Ridge Cir

Built 2002 · 7,874 sq ft
LOT 39,891 SQ FT · 1 STRUCTURE · APN 2727-022-032Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
7,874 sqft
Lot size
39,891 sqft
Structures on lot
1
Bedrooms
7
Bathrooms
7
Home type
Single-family
Parcel (APN)
2727-022-032

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2022 to 2032From build year 2002
20262035
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 29 homes on S Summit Ridge Cir →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedSolar: $0 Fee Per Ab1414.E-Plan. Install 16.685 Kwdc Pv System With (47) Modules, 2 Inverters At 3.8 Kw And 7.6 Kw.
  • 2023
    permit on fileElectrical: Main Breaker Derate: Replace Existing 200 Amp Main. Breaker With New175 Amp 22K Aic Rated Main Breaker
  • 2022
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing _24_____Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labe
  • 2022
    permit on fileSolar: [Eplan] Install 16.68 Kw Dc Roof Mounted Pv System. (47) Modules With (2) Inverters. $0 Permit Fee Per State Assembly Bill 1414
  • 2015
    permit on file, unconfirmedGeneral remodel: Remove 2Nd Floor Closet, And Replace (E) Ceiling Beam, Replace (E) 2 X · OWNER-BUILDER
  • 2014
    permit on file, unconfirmedGeneral remodel: Fire Damage Repair For Residential Building Only (Maximum 10% Of Repla · J F S CONSTRUCTION GROUP INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022
  • Now
    Roof replacementExpected 2022 to 2032