LAHomework Sign in
Los Angeles, CA 91402 · Vesper Ave

9800 Vesper Ave Unit 61

Built 1981 · 875 sq ft
SHARED CONDO LOT · APN 2647-030-196Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1981
Living area
875 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
1
Home type
Condo / townhome
Parcel (APN)
2647-030-196

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterOn record 2021
Expected 2031 to 2036From the 2021 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Replacement Of One Split-System Hvac Unit At Existing Outdoor Location, Including Relocation Of Indoor Air Handler And Installation Of One New Dedicated 240V Electrical Branch Circuit With Required Disconnect. Electrical Work Under Licensed C-10 Contractor. No Service Upgrade
  • 2026
    permit on file, unconfirmedElectrical: Branch Circuit Breaker And Disconnect For Hvac
  • 2026
    permit on fileHeating & cooling: Hvac Change Out
  • 2026
    permit on file, unconfirmedHeating & cooling: Hvac Change Out
  • 2025
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing_61_Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone(Vhfhsz).For Residential Roof Replacement>50% Of The Total Roof Area, Apply Cool Roof Product Labeled And C
  • 2025
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing_61_Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone(Vhfhsz).For Residential Roof Replacement>50% Of The Total Roof Area, Apply Cool Roof Product Labeled And C
  • 2025
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 61 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2025
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing___62___Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone(Vhfhsz).For Residential Roof Replacement>50% Of The Total Roof Area, Apply Cool Roof Product Labeled A
  • 2025
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing__62__Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone(Vhfhsz).For Residential Roof Replacement>50% Of The Total Roof Area, Apply Cool Roof Product Labeled And
  • 2025
    permit on fileElectrical: Connect To Existing Circuit
  • 2025
    permit on fileHeating & cooling: Replace 1 A/C Unit, 1 Furnace, 7 Ducts
  • 2025
    permit on file, unconfirmedHeating & cooling: Change Out 2.5 Ton Condenser , Furnace And Coil. Like For Like .
  • 2024
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 65 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2024
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 65 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2024
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing _65_Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled
  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing __64____Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labe
  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 64 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 60 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing __60__Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labele
  • 2023
    permit on file, unconfirmedHeating & cooling: Replace 2-Ton Heat Pump - Back Yard, Replace Air Handler - Closet
  • 2022
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing ___58___Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labe
  • 2022
    permit on fileGeneral remodel: Window (2) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24.
  • 2021
    permit on fileGeneral remodel: Interior Remodel And Beam Replacement For The Removal Of (E) Bearing Wall
  • 2021
    permit on fileGeneral remodel: Window (5) Change-Out (Same Size & Type) For Residential Buildings.
  • 2021
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing (58 ) Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof
  • 2021
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing (58 ) Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof
  • 2021
    permit on fileElectrical: #57 - New 120 Amp Sub-Panel And Rewire For Unit.#55 - Install 7 Receptacles, Exhaust Fan And 7 Light Fixtures. #56 - Install 5 Receptacles, Exhaust Fan And 7 Light Fixtures
  • 2021
    permit on file, unconfirmedElectrical: * 4 New Ceiling Lights.* Master Bedroom* Kids Bedroom * Living Room & Dining Room.
  • 2021
    permit on fileElectrical: Remove 2 Switches And 2 Outlets On Demolition Wall
  • 2021
    permit on fileWater heater: Fixtures And Water Heaters
  • 2021
    permit on file, unconfirmedHeating & cooling: Install New Ducting And Split Hvac Units For Units #55, 56, 57.
  • 2021
    permit on filePlumbing: Moving Over 7 Feet Rough Plumbing For Island Kitchen Sink Including Drain Hot/ Cold Water Lines. And For Wall Mounted Shower Valve Installation.
  • 2021
    permit on filePlumbing: Install (1) Seismic Gas Shut Off Valve For Unit #59
  • 2021
    permit on fileHeating & cooling: Relocate Kitchen Vent Pipe
  • 2021
    permit on file, unconfirmedHeating & cooling: Replacing 2.5 Ton Condenser, Coil And Furnace Like For Like Same Place Location
  • 2020
    permit on fileGeneral remodel: (6)Window And (1) Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B)1B Of Title 24
  • 2020
    permit on file, unconfirmedRoof: Reroof With 60 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2020
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solidsheathing (60) Squares. For Residential Roof Replacement > 50% Of The Total Roof Area, Applycool Roof Product Labeled And Certified By Cool Roofing Rating Council (Crrc). Cool Roofmay Be Required For Non-Re
  • 2020
    permit on file, unconfirmedRoof: Reroof With 60 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2020
    permit on file, unconfirmedRoof: Reroof With 60 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2020
    permit on file, unconfirmedRoof: Reroof With 60 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2020
    permit on file, unconfirmedRoof: Reroof With 60 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2020
    permit on file, unconfirmedRoof: Reroof With 60 Sqrs Comp Shingle Roofing. Existing Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2020
    permit on file, unconfirmedKitchen: Kitchen Remodel For Residential Buildings (No Structural Changes).
  • 2020
    permit on file, unconfirmedGeneral remodel: Fire Damage Repair For Residential Building Only (Maximum 10% Of Replacement Cost Of Building).

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Water heater replacementExpected 2031 to 2036