LAHomework Sign in
Los Angeles, CA 91343 · Mclennan Ave

9763 Mclennan Ave

Built 1961 · 1,780 sq ft
LOT 7,724 SQ FT · 1 STRUCTURE · APN 2686-025-016Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1961
Living area
1,780 sqft
Lot size
7,724 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
2686-025-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2013
Expected 2033 to 2043From the 2013 permit
20262035
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 117 homes on Mclennan Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileBathrooms: 1 Bathroom(S).Bathroom Remodel For Residential Buildings (No Structural Changes).
  • 2023
    permit on fileElectrical: "Comply With Department Order Effective Date 10/05/2022. Permit Will Expire 30 Days From Issuance Date". Upgrade Panelto 200A
  • 2022
    permit on fileBathrooms: Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2022
    permit on fileGeneral remodel: Replace 10 Window(S). Same Size, Location, Number, Type. Replace 1 Door(S). Same Size, Location, Number, Type.
  • 2022
    permit on fileElectrical: Lights
  • 2022
    permit on fileSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.
  • 2022
    permit on file, unconfirmedElectrical: Replacing Old Fexisting Panel To New No Lines Added To The System. "Comply With Department Order Effective Date 10/05/2022. Permit Will Expire 30 Days From Issuance Date".
  • 2022
    permit on fileWater heater: Tankless Water Heaterwasher
  • 2022
    permit on fileHeating & cooling: Exhaust Fandryer
  • 2022
    permit on file, unconfirmedHeating & cooling: Full System Replacement With Ducts.
  • 2021
    permit on filePlumbing: 1-Gas Valve.
  • 2013
    permit on fileRoof: Reroof With 23 Sqrs Comp Shingle Roofing. Existing Solid Sheathing. · HERMAN'S ROOFING

Manage this home to schedule a service or to update the timeline.