LAHomework Sign in
Temple City, CA 91780 · Nadine St

9645 Nadine St

Built 1957 · 1,862 sq ft
LOT 5,136 SQ FT · 2 STRUCTURES · APN 8588-023-006Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1957
Living area
1,862 sqft
Lot size
5,136 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
8588-023-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 113 homes on Nadine St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileWater heater: Shower, Clothes Washer, Hose Bibb, Lavatorie, Sink, Water Closet, Water Heater, Gas Outlets, Water Main And Connect Studio Accessory Dwelling To Public Sewer
  • 2022
    permit on fileHeating & cooling: Install Mini Split System For A Studio Accessory Dwelling Unit
  • 2022
    permit on fileElectrical: 16 Outlets, 16 Light Fixtures, Garbage Disposal, Range Hood, Exhaust Fan, Heat Pump, Ac Unit With 100 Amp Sub-Panel For Studio Accessory Dwelling Unit
  • 2016
    permit on fileSolar: Pv Solar Roof Install, 7.6385 Kw, 1 Inverter And 29 Panels
  • 2013
    permit on fileElectrical: 22 Outlets, 2 Light Fixtures And Washing Machine
  • 2013
    permit on fileRoom addition: Add New Master Bedroom, Bathroom, Closet, Family Room And Relocate Laundry Room
  • 2010
    permit on filePlumbing: Repipe Home And Remodel Shower
  • 2010
    permit on fileElectrical: Service Panel Upgrade 200 Amp & Partial Rewire, Install 6 Recessed Lights
  • 2010
    permit on fileRoof: Tear Off & Refoof 30 Yr Composition Shingles Detached Garage
  • 2010
    permit on fileRoof: Tear Off & Refoof 30 Yr Composition Shingles 19 Squares And Remodel Existing Bathroom
  • 2007
    permit on fileGeneral remodel: Provide And Install 11 Windows Like For Like Dual Pane Lowe Glass
  • 2007
    permit on filePlumbing: Gas Line For Hvac System
  • 2007
    permit on fileHeating & cooling: Install Air Conditioning And Heating System
  • 2007
    permit on fileElectrical: Electrical For Hvac System

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Roof replacementExpected 2030 to 2040