LAHomework Sign in
Los Angeles, CA 90019 · S Victoria Ave

951 S Victoria Ave

Built 1922 · 2,488 sq ft
LOT 8,550 SQ FT · 2 STRUCTURES · APN 5090-025-015Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
2,488 sqft
Lot size
8,550 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
1
Home type
Single-family
Parcel (APN)
5090-025-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 181 homes on S Victoria Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Service Upgrade From 200 A To 320 A1 200 A Service Installed.
  • 2024
    permit on fileRoof: Interior/Exterior Remodel To (E) Single Family Dwelling (No New Floor Area) . Remove And Reframe Portion Of The (E) Roof For Vaulted Ceiling . Exterior Window And Door Infill And New Window And Door Openings . Reconfigure Interior Floor Plan Layout . Structural Framing And Foundation Alterations Per
  • 2020
    permit on fileGeneral remodel: Add Sill Plate Anchor Bolt And Plywood To Cripple Walls (If Existing) Per La City Standard Plan#1; No Foundation Replacement (Earthquake Hazard Reduction Per Chapter 92 Of The Losangeles Building Code). Houses, Residential Buildings Up To 3 Stories And Up To 4 Units.
  • 2018
    permit on filePlumbing: Plumbing Permit · METRO RETROFITTING INC

Manage this home to schedule a service or to update the timeline.