LAHomework Sign in
South Gate, CA 90280 · Bryson Ave

9504 Bryson Ave

Built 1947 · 844 sq ft
LOT 3,494 SQ FT · 2 STRUCTURES · APN 6217-022-001Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
844 sqft
Lot size
3,494 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6217-022-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2012
Expected 2022 to 2027From the 2012 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 211 homes on Bryson Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2012
    permit on fileWater heater: Water Heater Replacement
  • 2012
    permit on fileElectrical: Hvac System -
  • 2011
    permit on fileRoof: Tear Off And Re Roof Dwg 10 Sq'S Recycle Required, Fill Out Wwrp Form And Return To Building And Safety Along With Receipts Before Final. Carbon Monoxide Detectors Required Before Final For Jobs Over $1,000.00 Valuations
  • 2011
    permit on fileGeneral remodel: Previous Replacement Of Window At South Side Bedroom
  • 2010
    permit on fileElectrical: Rewire Dwg- Service Upgrade Repipe Hot And Cold Water Lines Kitchen Remodel Bathroom Remodel

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2022 to 2027
  • 2031
    Roof replacementExpected 2031 to 2041