LAHomework Sign in
Glendale, CA 91207 · Hillcroft Rd

939 Hillcroft Rd

Built 1979 · 2,218 sq ft
LOT 11,798 SQ FT · 1 STRUCTURE · APN 5649-027-011Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1979
Living area
2,218 sqft
Lot size
11,798 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
5649-027-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 34 homes on Hillcroft Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installation Of An Ess System 38.4Kwh Or Less And/Or Flush Roof Mounted Photovoltaic System On A Residential Single-Family Dwelling, Including Adus, 38Kw Or Less. This Installation Shall Comply With The Electrical, Fire And Building Provisions Of The Most Recent Applicable Code Cycle.
  • 2014
    permit on filePlumbing: 1 Dishwasher.
  • 2001
    permit on fileRoof: Material:Class A - No. Of Squares:19 Sqs - Tear Of Existing (Y/N):Y - Existing No. Of Layers:1 - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2021 to 2031