LAHomework Sign in
Alhambra, CA 91801 · S 4th St

931 S 4th St

Built 1924 · 824 sq ft
LOT 5,465 SQ FT · 2 STRUCTURES · APN 5347-003-013Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
824 sqft
Lot size
5,465 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5347-003-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2021
Expected 2031 to 2036From the 2021 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 147 homes on S 4th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileHeating & cooling: Mechanical To Covert Existing 1 Car Garage To Adu (216 Sq. Ft.) , Covert Existing Bonus Room To Adu (166 Sq. Ft.) And Provide Addition For The Adu (368 Sq. Ft.) , Total Adu 750 Sq.Ft. Badu-2024-0115
  • 2025
    permit on fileRoom addition: Convert Existing 1 Car Garage To Adu (216 Sq. Ft.), Convert Existing Bonus Room To Adu (166 Sq.Ft.) And Provide Addition For The Adu (368 Sq.Ft.), Total Adu 750 Sq.Ft.
  • 2025
    permit on fileElectrical: Electrical To Covert Existing 1 Car Garage To Adu (216 Sq. Ft.) , Covert Existing Bonus Room To Adu (166 Sq. Ft.) And Provide Addition For The Adu (368 Sq. Ft.) , Total Adu 750 Sq.Ft. Badu-2024-0115
  • 2025
    permit on filePlumbing: Plumbing To Covert Existing 1 Car Garage To Adu (216 Sq. Ft.) , Covert Existing Bonus Room To Adu (166 Sq. Ft.) And Provide Addition For The Adu (368 Sq. Ft.) , Total Adu 750 Sq.Ft. Badu-2024-0115
  • 2022
    permit on fileGeneral remodel: Voluntary Seismic Upgrade Using Ladbs Standard Plan #1 (Foundation Anchor Bolting)
  • 2021
    permit on fileWater heater: Water Heater Replacement
  • 2021
    permit on fileElectrical: Main Panel Upgrade To 200Amp.

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Water heater replacementExpected 2031 to 2036