LAHomework Sign in
Pasadena, CA 91106 · Arden Rd

930 Arden Rd

Built 1924 · 3,020 sq ft
LOT 19,385 SQ FT · 3 STRUCTURES · APN 5328-001-001Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
3,020 sqft
Lot size
19,385 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5328-001-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2000
Usually done by 2020From the 2000 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 86 homes on Arden Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installation Of Roof-Mounted Pv: 27 Modules, 2 Tesla Powerwall Ess, (1) 200A Internal Load Center; System: 11.34 Kw Dc / 10.409 Kw Cec-Ac, 11.5 Kw Ac
  • 2025
    permit on fileSolar: Electrical Permit For Installation Of Roof-Mounted Pv: 27 Modules, 2 Tesla Powerwall Ess, (1) 200A Internal Load Center; System: 11.34 Kw Dc / 10.409 Kw Cec-Ac, 11.5 Kw Ac
  • 2025
    permit on fileElectrical: 200 Amp Meter Panel Upgrade
  • 2025
    permit on fileElectrical: Install (2) Circuits For Electric Gate Opener
  • 2025
    permit on fileRoof: Reroof House Only, Tear Off Comp Shingles, Install New Class A Comp Shingles, Cool Roof
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2000
    permit on fileGeneral remodel: Room Additions - 1St Floor 80 S/F + 2Nd Floor 498 S/F
  • 2000
    permit on fileHeating & cooling: Installing Mechanical For Kitchen Remodel - 2 Bedroom + 2 Bathroom + Laundry Room Additions
  • 2000
    permit on fileElectrical: Installing Electrical For Kitchen Remodel - 2 Bedroom,2 Bathroom + Laundry Room Additions
  • 2000
    permit on filePlumbing: Installing Plumbing For Kitchen Remodel - 2 Bedroom, 2 Bathroom + Laundry Room Additions
  • 1995
    permit on fileRoof: Reroof Partial House W/Mod. Bitumen Ul R14571 Class A

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2020