LAHomework Sign in
West Hollywood, CA 90069 · Doheny Rd

9255 Doheny Rd Unit 706

Built 1965 · 1,672 sq ft
SHARED CONDO LOT · APN 4392-014-053Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1965
Living area
1,672 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
3
Home type
Condo / townhome
Parcel (APN)
4392-014-053

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedHeating & cooling: 2 Heatpump Units, Both Under 5-Tons, 10 Inlets And Outlets
  • 2026
    permit on file, unconfirmedElectrical: ****Must Be Issued Concurrently With Building Permit**** Replace 30 Existing Light Fixtures Replace All Electrical Receptacles Replace All Electrical Switches Add One 20Amp Circuit For Toto Gfci Add 2-20Amp Circuits For Dw-Gd
  • 2026
    permit on file, unconfirmedPlumbing: **Awaiting Permit Issuance Of Bres26-0388** Waste, Water, Vents, Rough-In Plumbing Work,Removal And Replacement Of Fixtures
  • 2026
    permit on file, unconfirmedBathrooms: Remodel To An Existing Two-Bedroom Two-And-A-Half-Bathroom 7Th Level Condominium (Unit 706) To Include The Removal Of Interior Non-Load Bearing Walls, Installation Of New Non-Load Baring Walls, New Millwork, New Fixtures, New Flooring And New Finishes Per Stamped Approved Plans Dated 7/7/2026.

Manage this home to schedule a service or to update the timeline.