LAHomework Sign in
Glendale, CA 91206 · Glenvista Dr

919 Glenvista Dr

Built 1951 · 2,232 sq ft
LOT 8,456 SQ FT · 2 STRUCTURES · APN 5665-003-024Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1951
Living area
2,232 sqft
Lot size
8,456 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5665-003-024

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2015
Expected 2035 to 2045From the 2015 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 18 homes on Glenvista Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoom addition: Modified Soils Report For 508 Sf Addition At The Back Of The Existing Single Family Dwelling.
  • 2024
    permit on fileRoom addition: Remove Existing Covered Patio, Exterior Stairway And Open Patio Deck Above On The 2Nd Floor At The Rear Of (E)Two-Story Sfd. Additional Work Includes Adding A New 392 Sf Family Room With A New Exterior Stairway To The New Open Patio Deck Above On The 2Nd Floor At The Rear Of (E)Two-Story Sfd.
  • 2015
    permit on fileRoof: Reroof As Follows: Sfd This Is A Change Of Roofing Material (Y/N): Y Proposed Roofing Material: Wood Shake Change To Tile Squares (100 Sf) Being Installed: 26 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 1 New Sheathing Being Installed (Y/N): Y High Fire Hazard Zone (Y/N): No All Tear-Offs
  • 2015
    permit on fileRoof: Reroof As Follows: Garage This Is A Change Of Roofing Material (Y/N): Y Proposed Roofing Material: From Wood Shake To Tile Squares (100 Sf) Being Installed: 6 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 1 New Sheathing Being Installed (Y/N): Y High Fire Hazard Zone (Y/N): All Tear-Offs Re

Manage this home to schedule a service or to update the timeline.