LAHomework Sign in
Los Angeles, CA 90044 · Orchard Ave

9109 Orchard Ave

Built 2021 · 3,696 sq ft
LOT 5,777 SQ FT · 2 STRUCTURES · APN 6039-002-036Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2021
Living area
3,696 sqft
Lot size
5,777 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
10
Bathrooms
6
Home type
Duplex (2 units)
Parcel (APN)
6039-002-036

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
Water heaterComing up
Expected 2031 to 2036From build year 2021
20262035
See 2 more systems expected later
RoofLater
Expected 2041 to 2051Original, built 2021
HVACLater
Expected 2036 to 2041Original, built 2021

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 130 homes on Orchard Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: 100Amp Temporary Power Pole
  • 2021
    permit on fileSolar: [Eplan] Standard Plan. Scope Of Work Includes: (8) Pv Modules, 8 Optimizers, And (1) Se3000H-Us Inverter That Is Connected To An 100A Msp. System Size: 2.68 Kw Dc; 3 Kw Ac.Solar Pv Installation Shall Comply With Los Angeles Fire Department'S Fire Prevention Bureau (Fpb) Requirement No. 96***********
  • 2021
    permit on fileSolar: Pv1. New Solar System On Existing Residential Roof-Top. Total System Size Is 3.0Kwac.Note:9107 Is The 1St Unit (Full Duplex Address Is 9107-9109 S Orchard Ave)New Bldg Pcis #: 20010-10000-02564

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Water heater replacementExpected 2031 to 2036