LAHomework Sign in
Los Angeles, CA 90001 · E 77th St

910 E 77th St

Built 1929 · 1,874 sq ft
LOT 5,077 SQ FT · 3 STRUCTURES · APN 6023-028-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1929
Living area
1,874 sqft
Lot size
5,077 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
6023-028-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 220 homes on E 77th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoom addition: Convert Detached Garage At Rear Of Lot Into Adu Per State Law.
  • 2024
    permit on fileElectrical: Upgrade Electrical Panel. This Units Panel Will Become A Sub Panel And Will Be Ran To The Adu Near The Alley And Combined Into A New 3 Gang Meter Main. Per Ladbs
  • 2024
    permit on fileElectrical: New 400 Amps 3 Gang Meter Main Intall. Run New Feed For The Other 2 Units.
  • 2024
    permit on fileElectrical: Upgrade Electrical Panel. This Units Panel Will Become A Sub Panel And Will Be Ran To The Adu Near The Alley And Combined Into A New 3 Gang Meter Main.
  • 2023
    permit on file, unconfirmedGeneral remodel: 1- Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24 ( Roll Up Garage Do

Manage this home to schedule a service or to update the timeline.