LAHomework Sign in
Los Angeles, CA 90047 · S Wilton Pl

8930 S Wilton Pl

Built 1940 · 1,623 sq ft
LOT 5,752 SQ FT · 2 STRUCTURES · APN 6036-021-008Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
1,623 sqft
Lot size
5,752 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
6036-021-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 317 homes on S Wilton Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Install Disconnect Box For A/C
  • 2025
    permit on fileHeating & cooling: Install 1 Ton Mini Split System
  • 2024
    permit on fileRoom addition: Convert (Existing) Rooms And Rear Bedroom To An Jr. Accessory Dwelling Unit (490Sf) To Include Door Closure And An Installation Of A Kitchenette. "Comply With Department Order. Permit To Expire 30 Days From Issuance Date."
  • 2021
    permit on fileElectrical: Split Front House From Adu At Back. Add New 100Amp Service Panel And Move All Adu Circuits To New Panel. Add Some Extra Outlets.
  • 2020
    permit on file, unconfirmedElectrical: The House Is Split Into 2 Units With Only One Meter. It Has A 200 Amp Service And I Plan To Replace It With A 2 Gang Meter And 2 Outdoor Panels, One For Each Unit.
  • 2015
    permit on filePlumbing: Plumbing Permit · METRO RETROFITTING INC
  • 2015
    permit on fileElectrical: Electrical Permit · AMEERA ENTERPRISES INC

Manage this home to schedule a service or to update the timeline.