LAHomework Sign in
South Gate, CA 90280 · Hildreth Ave

8916 Hildreth Ave

Built 1949 · 832 sq ft
LOT 3,828 SQ FT · 1 STRUCTURE · APN 6222-015-009Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1949
Living area
832 sqft
Lot size
3,828 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6222-015-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2009
Expected 2029 to 2039From the 2009 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 194 homes on Hildreth Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedGeneral remodel: Inspection Only For New Presale With Ps#25-10249 Inspection Date: Monday March 17, 2025 Inspection Hours Are Between 9-5 Pm - Call Inspector Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9549. Please Be Aware That, Although The Inspection Is Exterior Only, If The Inspector Sees
  • 2013
    permit on fileElectrical: Bathroom Remodeling
  • 2013
    permit on fileGeneral remodel: Voluntary Foundation Retrofit
  • 2013
    permit on fileElectrical: Replacement Of The Main Water System & Sewer Line Replacement Of The Tankless Water Heater
  • 2013
    permit on fileElectrical: Service Upgrade - 200 Amp Re-Wire Of The Main Dwelling To Include The Replacement Of Switches And Outlets
  • 2010
    permit on fileGeneral remodel: Front Window Replacement 70 3/4" X 59 1/2" -Window Must Have An 18" Clearance From Floor And Doors Or Tempered Glass Is Required.
  • 2009
    permit on fileRoof: T/O & Reroof 14 Sq.Ft.

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Roof replacementExpected 2029 to 2039