LAHomework Sign in
Los Angeles, CA 90045 · Ramsgate Ave

8911 Ramsgate Ave

Built 1949 · 3,381 sq ft
LOT 14,016 SQ FT · 4 STRUCTURES · APN 4125-012-016Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1949
Living area
3,381 sqft
Lot size
14,016 sqft
Structures on lot
4 main home plus another structure: a garage, guest house or ADU
Bedrooms
8
Bathrooms
4
Home type
Duplex (2 units)
Parcel (APN)
4125-012-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 159 homes on Ramsgate Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: (1) - 200-Amp Temporary Power Pole, (1) - 200-Amp Distribution Panel & (2) - 20-Amp Receptacles. Temp Power Is Needed For Construction Project Of Multi-Family Complex.
  • 2026
    permit on file, unconfirmedElectrical: [Eplan] New 5-Story, 77-Unit Apartment Building. 1600 Amp, 208 Volt, 3-Phase Service.
  • 2026
    permit on file, unconfirmedElectrical: [Eplan] New Fire Alarm System With (1) Facp And (212) Fa Devices.
  • 2026
    permit on file, unconfirmedElectrical: (Eplan) Changes To An Approved Set, Adding New Loads/Circuits, Ugrade Elevator, And Removing/Relocating Loads. New 5-Story, 77-Unit Apartment Building, 1600 Amp 208V 3-Phase Service.
  • 2026
    permit on file, unconfirmedHeating & cooling: General Hvac
  • 2025
    permit on filePlumbing: Sewer Cap
  • 2025
    permit on filePlumbing: Sewer Cap
  • 2025
    permit on file, unconfirmedPlumbing: Potable Water System. Waste And Vent System. 3" Domestic Water Meters And 4" Rp Backflow.

Manage this home to schedule a service or to update the timeline.