LAHomework Sign in
Los Angeles, CA 90044 · Menlo Ave

8822 Menlo Ave

Built 1922 · 1,400 sq ft
LOT 5,103 SQ FT · 1 STRUCTURE · APN 6038-021-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
1,400 sqft
Lot size
5,103 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
6038-021-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 194 homes on Menlo Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: Run Dedicated 220V Wire To Condenser Location
  • 2023
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Central/String Inverter Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2023
    permit on fileSolar: [Eplan] New Roof-Mounted Solar Pv1 System With (8) Modules/Optimizers And (1) Central Inverter Connected To New 200A Msp. System Size Is 3.2Kw Dc / 3.8Kw Ac.***New Msp To Be Under Separate Permit.***
  • 2023
    permit on fileElectrical: Msp Upgrade From 100 A To 200 A
  • 2023
    permit on fileHeating & cooling: Installation Of 4 Ton Heat Pump Condenser And Air Handlerair Ducts Installation
  • 2013
    permit on fileElectrical: Electrical Permit · SOLARCITY CORPORATION

Manage this home to schedule a service or to update the timeline.