LAHomework Sign in
Pasadena, CA 91104 · N Allen Ave

880 N Allen Ave

Built 1947 · 2,080 sq ft
LOT 9,295 SQ FT · 4 STRUCTURES · APN 5745-003-033Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
2,080 sqft
Lot size
9,295 sqft
Structures on lot
4 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5745-003-033

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 1991
Usually done by 2011From the 1991 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 136 homes on N Allen Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPlumbing: Plumbing For Hallway Bathroom Remodeling With New Tiles. New Toilet Bowl And Add New Cabinet + Faucet. Kitchen Remodel With New Hookup For Wash/Dryer. Minor Drywall Patch At Bedroom, 1 Sheet Behind Door. Master Bath 2- Replace Vanity (Ctpb2026-00059)
  • 2026
    permit on file, unconfirmedElectrical: Electrical For Hallway Bathroom Remodeling With New Tiles. New Toilet Bowl And Add New Cabinet + Faucet. Kitchen Remodel With New Hookup For Wash/Dryer. Minor Drywall Patch At Bedroom, 1 Sheet Behind Door. Master Bath 2- Replace Vanity (Ctpb2026-00059)
  • 2026
    permit on file, unconfirmedKitchen: Hallway Bathroom Remodeling With New Tiles. New Toilet Bowl And Add New Cabinet + Faucet. Kitchen Remodel With New Hookup For Wash/Dryer. Minor Drywall Patch At Bedroom, 1 Sheet Behind Door. Master Bath 2- Replace Vanity (Ctpb2026-00059)
  • 2023
    permit on fileRoof: Tear Off At Back Side Of The Roof At Main House Only. Existing Plywood/Wood Repair As Needed. Install New Composition Shingles Using "Midnight" Color By Owens Corning. "Class A" Cool Roof (20 Squares)
  • 1991
    permit on fileGeneral remodel: Bu - Enclose Exist. Patio Cover (400 Sq/Ft) For De
  • 1991
    permit on fileHeating & cooling: Me - Install Furnace + Compressor For Hvac
  • 1991
    permit on fileElectrical: El - Install Plumb. + Elect. Service + Fixtures Fo Remodel
  • 1991
    permit on filePlumbing: Pl - Install Plumb. + Elect. Service + Fixtures Fo Remodel
  • 1991
    permit on fileRoof: Bu - Changing The Roof Rafters Beams
  • 1991
    permit on fileRoof: Bu - Re Roof House + Garage W/Genstar Ul R#11655 C A + Windows
  • 1991
    permit on fileRoof: Rf - Re Roof House + Garage W/Genstar Ul R#11655 C A + Windows

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2011