LAHomework Sign in
Los Angeles, CA 90029 · N Madison Ave

864 N Madison Ave

Built 1928 · 2,056 sq ft
LOT 5,974 SQ FT · 2 STRUCTURES · APN 5539-011-011Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
2,056 sqft
Lot size
5,974 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5539-011-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on N Madison Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Upgrade Existing Electrical Service To 400 Amps, 120/240V By Installing A 7-Gang Meter/Main Panel And Obtain Permit For And Install Underground Pvc Conduits To Serve 2 New Units (Already Constructed And Previously Inspected).
  • 2026
    permit on fileElectrical: Install 9 Outdoor Lights And 60 Amps 120/240-Volt House Panel, 4 New Branch Circuits & 1 Sub Panel 0-200Amps
  • 2026
    permit on filePlumbing: Install Seismic Earthquake Valve
  • 2025
    permit on fileSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels On Adu1. Pv System Includes 4 Modules With 4 Microinverters And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 1.76Kw Dc/1.46Kw Ac.
  • 2025
    permit on fileSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels On Adu2. Pv System Includes 4 Modules With 4 Microinverters And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 1.76Kw Dc/1.46Kw Ac.
  • 2025
    permit on filePlumbing: Drain Add On And Water Supply Line
  • 2025
    permit on fileWater heater: Tanked Water Heater Relocation And Replace With Tankless Unit. Gas And Water Lines Need To Be Moved.
  • 2022
    permit on fileElectrical: Recessed Lighting In Unit 866 1/2 N. Madison Ave.
  • 2022
    permit on fileWater heater: Plumbing For Tankless Water Heaters. Installation Of Tankless Water Heaters (Not Within Required Zoning Setbacks)
  • 2022
    permit on fileHeating & cooling: Mini Split Ac\Heating

Manage this home to schedule a service or to update the timeline.