LAHomework Sign in
Los Angeles, CA 91304 · Santa Susanna Pl

8610 Santa Susanna Pl

Built 1989 · 3,390 sq ft
LOT 15,163 SQ FT · 1 STRUCTURE · APN 2010-012-025Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1989
Living area
3,390 sqft
Lot size
15,163 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2010-012-025

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 6 homes on Santa Susanna Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2022
    permit on fileSolar: Plan Check For Pv Roof Mounted System, Pv System Size: 17.48Kw With 38 Pv Modules And 38 Micro-Inverters
  • 2016
    permit on fileElectrical: Electrical Permit · MUKHERJEE MANI
  • 2016
    permit on file, unconfirmedElectrical: Electrical Permit · MUKHERJEE MANI
  • 2014
    permit on file, unconfirmedRoom addition: Proposed 2-Story 2Nd Unit Per Za Memorandum # 120 Add'N To (E) 2-Story · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.