LAHomework Sign in
Los Angeles, CA 91040 · Grenoble St

8441 Grenoble St

Built 1955 · 2,946 sq ft
LOT 7,784 SQ FT · 2 STRUCTURES · APN 2555-026-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
2,946 sqft
Lot size
7,784 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2555-026-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2017
Expected 2032 to 2037From the 2017 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 85 homes on Grenoble St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 30 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2022
    permit on filePlumbing: Installing A Sump Pump
  • 2021
    permit on fileElectrical: "Comply With Department Order Effective Date06/20/2017. Permit Will Expire 30 Days From Issuance Date".1 Panel And 1 Service
  • 2021
    permit on fileElectrical: "Comply With Department Order Effective Date06/20/2017. Permit Will Expire 30 Days From Issuance Date"1 Panel Service
  • 2018
    permit on file, unconfirmedKitchen: Interior Remodel To Relocate Front Door, Remodel Kitchen , Create New · OWNER-BUILDER
  • 2017
    permit on fileKitchen: Kitchen (3) Bathroom Remodel For Residential Buildings (No Structural · OWNER-BUILDER
  • 2017
    permit on filePlumbing: Plumbing Permit · OWNER-BUILDER
  • 2017
    permit on fileElectrical: Electrical Permit · OWNER-BUILDER
  • 2017
    permit on fileHeating & cooling: Hvac Permit · OWNER-BUILDER
  • 2017
    permit on filePlumbing: Plumbing Permit · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.