LAHomework Sign in
Los Angeles, CA 90046 · Mannix Dr

8244 Mannix Dr

Built 1928 · 1,020 sq ft
LOT 2,905 SQ FT · 1 STRUCTURE · APN 5556-004-026Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,020 sqft
Lot size
2,905 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5556-004-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 34 homes on Mannix Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Remove And Replace Electrical Throughout Water Damaged Kitchen And Downstairs Bath. "Comply With Department Order Effective Date08/27/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on file, unconfirmedElectrical: Electrical Panel Upgrade"Comply With Department Order Effective Date08/27/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on file, unconfirmedHeating & cooling: Remove And Replace Rooftop Condesnor And Attic Air Handler. "Comply With Department Order Effective Date08/27/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on file, unconfirmedPlumbing: Plumbed In Kitchen That Was Removed And Replaced Due To Water Damage. "Comply With Department Order Effective Date08/27/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on file, unconfirmedKitchen: "Comply With Department Order Effective Date 08/27/2025. Permit Will Expire 30 Days From Issuance Date". Kitchen/Bathroom (1) Remodel For Residential Buildings (No Structural Changes). Window (6) And Door (3) Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certifie
  • 2025
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Overexisting Solid Sheathing (20 ) Squares. Class A Roof Covering Is Required Within Very High Firehazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roofarea, Apply Cool Roof Pro

Manage this home to schedule a service or to update the timeline.