LAHomework Sign in
Pasadena, CA 91104 · N Hill Ave

815 N Hill Ave

Built 1921 · 2,003 sq ft
LOT 13,837 SQ FT · 1 STRUCTURE · APN 5739-017-010Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1921
Living area
2,003 sqft
Lot size
13,837 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5739-017-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 1999
Expected 2019 to 2029From the 1999 permit
20262035
HVACOn record 2016
Expected 2031 to 2036From the 2016 permit
20262035
Water heaterOn record 2015
Expected 2025 to 2030From the 2015 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 164 homes on N Hill Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on filePlumbing: Express Permit Plm
  • 2021
    permit on fileGeneral remodel: Voluntary Foundation Seismic Retrofit To (E) Single Family Dwelling Per La City Standard Plan #1 & Engineered Details.
  • 2020
    permit on fileSolar: 11.88 Kw (Dc)/ 9.44 Kw (Ac) Pv System, (33) Panels, (1) Inverter, 33 Optimizers, (N) Pv Meter
  • 2020
    permit on fileElectrical: Panel Upgrade 200Amp Bus And 200A Main Breaker. New 225A Detached Load Center And 125A Generation Load Center. New 2 Tesla Powerwall Battery Backup (Ess), New 60A And 200A Ac Disconnect, New Tesla Backup Gatewayy 200A
  • 2017
    permit on filePlumbing: Sewer Line Replacement
  • 2016
    permit on fileElectrical: Installing Electrical Fixtures
  • 2016
    permit on fileHeating & cooling: Install (2) New Hvac Systems
  • 2015
    permit on fileElectrical: Install Pull Box To Convert Overhead Electrical Services To Underground Electrical Services (Plan C)
  • 2015
    permit on fileWater heater: Replacement Of Water Heater
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2007
    permit on filePlumbing: Install Plumbing For New Garage
  • 2007
    permit on fileElectrical: Upgrade Exist. Electrical Service Add Fixtures Sub Panel & Washer/Dryer In New Garage
  • 2007
    permit on fileGeneral remodel: Demo (E) Garage And Rebuild Attached Garage @ 1196 Sq/F
  • 1999
    permit on fileRoof: Re Roof House + Garage W/Class A Shingle

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2019 to 2029
  • Now
    Water heater replacementExpected 2025 to 2030
  • 2031
    HVAC replacementExpected 2031 to 2036