LAHomework Sign in
Glendale, CA 91203 · N Columbus Ave

811 N Columbus Ave Unit 24

Built 1981 · 1,277 sq ft
SHARED CONDO LOT · APN 5636-015-126Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1981
Living area
1,277 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
2
Home type
Condo / townhome
Parcel (APN)
5636-015-126

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2012
Expected 2027 to 2032From the 2012 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Partial Roof Tear Off Building (2,200 Sqft) Comp Shingles, Color: Forest Brown, Crrc#0890-0018A
  • 2021
    permit on fileRoom addition: Addition Of 1/4" X1/4" A36 Steel Bars To Existing Railing To Reduce The Maximum Opening Width From 6 5/8" To Less Than 4". Bars To Be Welded To Existing At 2 Points
  • 2015
    permit on fileRoof: Reroof As Follows: Condo This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Comp Shingle Squares (100 Sf) Being Installed: 60 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: 2 New Sheathing Being Installed (Y/N): Y High Fire Hazard Zone (Y/N): N All Tear-Offs Require Sol
  • 2014
    permit on fileRoof: Reroof As Follows:Mfd This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingles Squares (100 Sf) Being Installed: 79 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 2 New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y/N): No All Tear-Offs Require
  • 2013
    permit on fileElectrical: 1 Outlet
  • 2013
    permit on fileRoof: Reroof As Follows: This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Class B Squares (100 Sf) Being Installed: 10 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: New Sheathing Being Installed (Y/N):N High Fire Hazard Zone (Y/N): N All Tear-Offs Require Solid Sheathing.
  • 2012
    permit on fileHeating & cooling: 1-Broiler/ 1-Gas System
  • 2011
    permit on fileRoof: Reroof As Follows: Class A Mfd This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingle/Built Up Squares (100 Sf) Being Installed: Comp Shingle 9, Built Up 8 Sqs Total 17 Sqs Tear Off Existing (Y/N): Built Up Tear Off, Comp Shingle No Existing Layers Of Roofing: Comp Sh

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2027
    HVAC replacementExpected 2027 to 2032