LAHomework Sign in
Los Angeles, CA 90045 · Holy Cross Pl

8109 Holy Cross Pl

Built 1941 · 1,117 sq ft
LOT 5,973 SQ FT · 2 STRUCTURES · APN 4113-007-027Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
1,117 sqft
Lot size
5,973 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
4113-007-027

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 76 homes on Holy Cross Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileSolar: Pv Roof Mounted System, Pv System Size: 9.02Kw Dc With 22 Pv Module And 22 Micro-Inverters.
  • 2024
    permit on fileElectrical: Outlets For Water Heater Dryer
  • 2024
    permit on fileWater heater: Water Heater Replacement
  • 2023
    permit on fileRoom addition: Eplan: New 2-Story Attached Adu To (E) Garage.Adu Per Ordinance
  • 2023
    permit on filePlumbing: Replace Existing Sewer Line To Existing Home To Reroute Sewer Line Around Footprint Of New Adu. Plans For Adu Are Rti. We Will Be Removing Approx 35 Ft Of Existing And Replacing With Approx 70 Feet Of New Sewer Pipe. All Pipe Is Located Within Boundaries Of Lot.
  • 2021
    permit on file, unconfirmedElectrical: Like-For-Like 100A Main Panel Upgrade
  • 2014
    permit on file, unconfirmedGeneral remodel: New Stucco W/Wire Lath Over (E) Siding To Remain. Area = 104 Sqft. · OWNER-BUILDER
  • 2014
    permit on file, unconfirmedGeneral remodel: Sandblast/Restucco Over Existing Stucco To Remain. Area = 104 Sqft. · OWNER-BUILDER
  • 2013
    permit on fileGeneral remodel: Add Sill Plate Anchors Bolts And Cripple Wall Plywood Per L.A. City St · AFTER BEFORE CREATIONS INC
  • 2013
    permit on fileGeneral remodel: Window (10) And Door (10) Change-Out (Same Size & Type) For Residentia · AMERICAN VISION
  • 2013
    permit on fileGeneral remodel: Door (Patio Door And French Door) Change-Out (Same Size & Type) For Re · AMERICAN VISION

Manage this home to schedule a service or to update the timeline.