LAHomework Sign in
Los Angeles, CA 90045 · Kentwood Ave

8072 Kentwood Ave

Built 1950 · 4,189 sq ft
LOT 8,499 SQ FT · 1 STRUCTURE · APN 4109-011-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
4,189 sqft
Lot size
8,499 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
4
Home type
Single-family
Parcel (APN)
4109-011-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 141 homes on Kentwood Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Electrical For Pool Equipment Replacement: Timer And Electrical Control Panel Same Location.Comply With Department Order Effective Date06/14/2023. Permit Will Expire 30 Days From Issuance Date"
  • 2025
    permit on fileWater heater: Plumbing Pool Equipment Replacement: Water Heater Same Location.Comply With Department Order Effective Date06/14/2023. Permit Will Expire 30 Days From Issuance Date"
  • 2024
    permit on fileElectrical: "Comply With Department Order Effective Date 06/14/2023. Permit Will Expire 30 Days From Issuance Date". Run Dedicated 220V Wire To Condenser Location And Outlet.Electrical Panel 200 Apms
  • 2024
    permit on fileHeating & cooling: Heat Pump & Air Handler 4 Ton. "Comply With Department Order Effective Date06/14/2023. Permit Will Expire 30 Days From Issuance Date".
  • 2023
    permit on fileBathrooms: 1 Bathroom(S).Bathroom Remodel For Residential Buildings (No Structural Changes)..
  • 2023
    permit on fileBathrooms: Eplan Remodel (E) 2-Story Sfd W/Att Garage, Including: Split (E) 1St Floor Bedroom In-To Two Bedrooms, Remodel 2Nd Floor Bedroom Add W.I.C, Open Door For (E) Bath With Remodel, Convert (E) Space To Add New Bath And New Bedroom, Remove And Replace Skylights, Replace Doors With Windows With Infill. "C
  • 2023
    permit on fileGeneral remodel: Voluntary Foundation Bolting Per City Std. Detail #7

Manage this home to schedule a service or to update the timeline.