LAHomework Sign in
Los Angeles, CA 90003 · S Main St

8010 S Main St

Built 1921 · 1,156 sq ft
LOT 4,976 SQ FT · 1 STRUCTURE · APN 6030-003-003Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1921
Living area
1,156 sqft
Lot size
4,976 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
1
Home type
Single-family
Parcel (APN)
6030-003-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2013
Expected 2028 to 2033From the 2013 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 193 homes on S Main St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: Main Panel Replacement: Existing 100 Amp Main Panel With 100 Amp Main Breaker To Be Replaced With New 225 Amp Main Panel With 200 Amp Main Breaker With 225 Amp Busbar. Surge Protector To Be Installed Per Manufacturer And Panel Board Specs. Install New 100A Pv Load Center
  • 2026
    permit on fileSolar: [E-Plan] New Rooftop Solar Installation 4.05 Kwdc / 3.8Kwac, (9) Modules, (1) Inverter. 225 A Main Panel Upgrade (Mpu).
  • 2025
    permit on file, unconfirmedElectrical: New 125Amp Load Center To Be Installed
  • 2025
    permit on file, unconfirmedSolar: New Rooftop Solar Installation 3.8 Kw , ( 12 ) Modules , (1) Inverters.New 125Amp Load Center To Be Installed(Eplan) Pv For Installation Of Roof Mounted Solar Panels. Pv System Includes 12 Modules With 12 Optimizers And 1 Central Inverter System Connected To Existing Main Service Panel. System Size
  • 2021
    permit on fileSolar: Installation Of Roof-Mounted Central/String Inverter Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2013
    permit on fileHeating & cooling: Hvac Permit · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    HVAC replacementExpected 2028 to 2033