LAHomework Sign in
Glendale, CA 91206 · E Doran St

801 E Doran St

Built 1938 · 2,485 sq ft
LOT 5,971 SQ FT · 2 STRUCTURES · APN 5643-011-027Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1938
Living area
2,485 sqft
Lot size
5,971 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5643-011-027

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 39 homes on E Doran St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileHeating & cooling: Two Fau Up To 100000 And Two A/C Up To 3 Hp 801-803 E Doran
  • 2020
    permit on filePlumbing: Repair (E) Sewer Line, Gas Connection To Devices, And Clothes Washer And Vent Intallation.
  • 2020
    permit on fileElectrical: Address Of Job Is 801 & 803 E. Doran 1 Electrical Service Up To 400 Amp Service
  • 2002
    permit on fileRoof: Material:Comp Shingles - No. Of Squares:21 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:2 - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. - - (801

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2022 to 2032