LAHomework Sign in
Los Angeles, CA 90272 · Radcliffe Ave

800 Radcliffe Ave

Built 2004 · 4,141 sq ft
LOT 6,884 SQ FT · 1 STRUCTURE · APN 4412-005-008Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
4,141 sqft
Lot size
6,884 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
4412-005-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACWorth a look now
Usually done by 2024From build year 2004
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 105 homes on Radcliffe Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: **2025 Wildfire Project**Deferred Submittal For 25010-10000-03721 For Roof Truss Design For Sfd
  • 2026
    permit on file, unconfirmedPool: 2025 Wildfire, New Pool With Spa 13'4 X 30' Per Engineer Design, Eo8.
  • 2026
    permit on fileSolar: Installation Of A Roof-Mounted Central/String Inverter Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on fileElectrical: 100Amp Temp Power Pole, 20Amp Circuit, 50Amp Circuit

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2024