LAHomework Sign in
Reseda, CA 91335 · Etiwanda Ave

7954 Etiwanda Ave

Built 2005 · 1,851 sq ft
LOT 6,329 SQ FT · 1 STRUCTURE · APN 2102-014-042Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
1,851 sqft
Lot size
6,329 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2102-014-042

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 209 homes on Etiwanda Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: (Eplan) Pv1 Pc For Installation Of Roof Mounted Solar Panels. Pv System Includes 31 Modules With 31 Microinverters And 1 Load Center Connected To Existing Main Service Panel. System Size Is 11.32Kw Dc/11.9Kw Ac.
  • 2023
    permit on file, unconfirmedElectrical: Main Breaker Downsize: (N) 175A Main Breaker

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035