LAHomework Sign in
Los Angeles, CA 91605 · Atoll Ave

7931 Atoll Ave

Built 1955 · 2,208 sq ft
LOT 7,467 SQ FT · 1 STRUCTURE · APN 2303-012-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
2,208 sqft
Lot size
7,467 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
2303-012-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 94 homes on Atoll Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: 200 Amps Panel Installation For Adu
  • 2023
    permit on fileElectrical: El. Panel Upgrade From 100 To 200 Amps
  • 2022
    permit on fileRoom addition: (N) Two Story Attached 23' X 22'-6" Accessory Dwelling Unit Per Lamc 12.22 A.33(C) And (E) To Replace (E) Carport All Work Per Engineeringthe Lid Clearance Has Been Deferred. Approval For Lid Requirements Shall Be Obtained From Lasan Prior Tothe Issuance Of The Certificate Of Occupancy.

Manage this home to schedule a service or to update the timeline.