LAHomework Sign in
Los Angeles, CA 90272 · Amalfi Dr

789 Amalfi Dr

Built 2010 · 7,034 sq ft
LOT 19,081 SQ FT · 1 STRUCTURE · APN 4408-013-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2010
Living area
7,034 sqft
Lot size
19,081 sqft
Structures on lot
1
Bedrooms
7
Bathrooms
10
Home type
Single-family
Parcel (APN)
4408-013-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2030 to 2040From build year 2010
20262035
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterWorth a look now
Usually done by 2025From build year 2010

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 160 homes on Amalfi Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileKitchen: Replace 4 Window(S). Same Size, Location, Number, Type. Replace 1 Door(S). Same Size, Location, Number, Type. Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2021
    permit on fileElectrical: Electrical For Removated Kitchen And Bathrooms
  • 2021
    permit on filePlumbing: Plumbing Remodel
  • 2021
    permit on fileHeating & cooling: Install 11 Bathroom Exhaust And Ductwork.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • 2030
    Roof replacementExpected 2030 to 2040