LAHomework Sign in
Los Angeles, CA 91325 · Lasaine Ave

7860 Lasaine Ave

Built 1951 · 1,366 sq ft
LOT 5,974 SQ FT · 2 STRUCTURES · APN 2201-020-029Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1951
Living area
1,366 sqft
Lot size
5,974 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
2201-020-029

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 142 homes on Lasaine Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: Installation Of (1) Enphase Iq Battery 5P With Iq System Controller And Backup Load Panel. Existing Pv System.
  • 2025
    permit on fileSolar: Pv1 For Installation Of Roof Mounted Solar Panels. Pv System Includes 17 Modules With 17 Microinverters And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 7.82Kw Dc/5.10Kw Ac.
  • 2024
    permit on fileElectrical: Panel Upgrade To 200 Amps
  • 2023
    permit on file, unconfirmedRoom addition: Eplanconvert Detached Garage To (N) Detached Adu"Comply With Department Order Dated 9/26/00. Permitwill Expire 30 Days From Issuance Date".

Manage this home to schedule a service or to update the timeline.