LAHomework Sign in
Los Angeles, CA 90272 · Radcliffe Ave

764 Radcliffe Ave

Built 1939 · 2,555 sq ft
LOT 7,473 SQ FT · 2 STRUCTURES · APN 4412-006-026Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1939
Living area
2,555 sqft
Lot size
7,473 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
4412-006-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 105 homes on Radcliffe Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Processing (1) 200A, 120/240V, 1P, 3W, Oh Temp Power Pole For Construction.
  • 2021
    permit on fileElectrical: Installing A Whole House 200 Amp Emergency Standby Generator. (1) 200 Amp Service Disc. W/ Load Shedding. Generator Will Be Able To Use Natrual Gas And Propane. Location Of Generator Is On Back Of Property. Underground Elec From Existing Electric Panel About 30 Feet .New 1 1/2 Inch Main Gas Line Fro
  • 2021
    permit on file, unconfirmedPlumbing: Putting In A New 1 1/2 Main Gas Supply Line To House And Continue To Rear Of Property.1 Seismic Valveone Branch Line Or Outlet. Gas Line Will Run On Side Of House To Rear Of Property To Supply New Emergency Generator. In Addition I Will Add 2 150 Gal Propane Tanks For Generator As Backup Fuel.

Manage this home to schedule a service or to update the timeline.