LAHomework Sign in
Glendale, CA 91206 · Foxkirk Rd

761 Foxkirk Rd

Built 1962 · 1,372 sq ft
LOT 11,789 SQ FT · 1 STRUCTURE · APN 5663-005-047Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1962
Living area
1,372 sqft
Lot size
11,789 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5663-005-047

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2007
Expected 2027 to 2037From the 2007 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on Foxkirk Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2012
    permit on filePlumbing: 1-Building Sewer Repair
  • 2012
    permit on fileGeneral remodel: Request:Install A Pipe Liner In A Main Sewer Line. The Material And Installation Methods Have Been Tested And Approved By Iapmo And Are Covered In The California Plumbing Code 2007 Edition Chapter 7 Section 715.3 Justification: 50Ft Of Driveway Would Have Had To Been Sawcut. It Would Have Placed An
  • 2007
    permit on fileRoof: Residential Reroof As Follows:- - - Estimated Cost Of Re-Roof:10000 - This Is A Change Of Roofing Material (Y/N):N - Proposed Roofing Material:Class A - Squares (100 Sf) Being Installed:32 - Tear Off Existing (Y/N):Y - Existing Layers Of Roofing:2 - New Sheathing Being Installed (Y/N):N - High Fire

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2027
    Roof replacementExpected 2027 to 2037