LAHomework Sign in
Los Angeles, CA 91304 · Graystone Dr

7530 Graystone Dr

Built 1995 · 3,096 sq ft
LOT 11,271 SQ FT · 2 STRUCTURES · APN 2027-026-038Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1995
Living area
3,096 sqft
Lot size
11,271 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2027-026-038

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2025From build year 1995
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 55 homes on Graystone Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 37 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on fileSolar: E-Palan. Installation Of 10.40 Kw Dc Pv System (26) Qcell Duo Blk Ml-G10 400W & (1) Solaredge Energy Hub Se7600H-Us, And One Battery Lg Resu 16Prime.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2025