LAHomework Sign in
Los Angeles, CA 91605 · Lemp Ave

7453 Lemp Ave

Built 1941 · 1,984 sq ft
LOT 6,600 SQ FT · 1 STRUCTURE · APN 2316-015-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
1,984 sqft
Lot size
6,600 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2316-015-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 111 homes on Lemp Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 30 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2024
    permit on fileSolar: This Plan Qualifies For Online Express Permit Per Sb 379, Applicnat Choose To Submit To Backroom Pcinstall New:21 Ure 445W Modules (Fbm445M7G-Bb) 11 Nep Bdm-800 (Nc0136-Us-T) Micro-Inverters2 Moduels Per Micro-Inverter125Amp Pv Load Centerdownsize Existing Msp From 200 Amp To 175 Amp
  • 2023
    permit on fileElectrical: Main Panel Upgrade To 200Amp
  • 2023
    permit on file, unconfirmedElectrical: 125 Amp Panel Upgrade To 200 Amp

Manage this home to schedule a service or to update the timeline.