LAHomework Sign in
Los Angeles, CA 91307 · Faust Ave

7414 Faust Ave

Built 1956 · 1,525 sq ft
LOT 8,038 SQ FT · 1 STRUCTURE · APN 2022-012-002Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,525 sqft
Lot size
8,038 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
2022-012-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACOn record 2015
Expected 2030 to 2035From the 2015 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 21 homes on Faust Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 23 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2026
    permit on file, unconfirmedSolar: Installation Of A Roof-Mounted Central/String Inverter Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2026
    permit on fileSolar: Permit To Remove And Re-Install Solar Panels After Reroof
  • 2016
    permit on fileElectrical: Electrical Permit · SUNRUN INSTALLATION SERVICES INC
  • 2016
    permit on fileElectrical: Electrical Permit · EMPIRE ELECTRICAL CONTRACTORS INC
  • 2015
    permit on fileHeating & cooling: Hvac Permit · AIR BREEZE INC
  • 2014
    permit on file, unconfirmedSolar: Pv1. Install 7.65 Kw Roof-Mounted, Utility-Interactive Pv System. Cen · SOLARCITY CORPORATION
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · SOLARCITY CORPORATION

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    HVAC replacementExpected 2030 to 2035