LAHomework Sign in
Los Angeles, CA 90044 · W 115th St

741 W 115th St

Built 1928 · 1,396 sq ft
LOT 10,508 SQ FT · 3 STRUCTURES · APN 6088-002-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,396 sqft
Lot size
10,508 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
6088-002-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 49 homes on W 115th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: Service Panel Verification Fo 4 Gang Meter Panel Installed Back In 2022
  • 2025
    permit on file, unconfirmedSolar: Note To Plan Checker: Applying Permit For - 743 West 115Th Street Los Angeles Ca 90044Verify Address With Applicant Before Issuance Of Permit.[Eplan] 6.450 Kw Dc/5.49Kwac Pv(15) Silfab Solar Sil-430Qd Solar Modules (15) Enphase Iq8A-72-2-Us Micro Inverter(1) 125A Enphase Iq Combiner 5C(1) 200A Load
  • 2025
    permit on file, unconfirmedSolar: 9.030 Kw Dc/7.329 Kw Ac Pv(21) Silfab Solar Sil-430Qd (430W) Solar Modules(21) Enphase Iq8A-72-2-Us (240V) Micro Inverter(1) 125A Enphase Iq Combiner 5C(2) 30A Ac Disconnect(1) 125A Load Center
  • 2023
    permit on fileElectrical: Service Panel Upgrade Meter Reconnect
  • 2023
    permit on file, unconfirmedPlumbing: Backwater Valve
  • 2022
    permit on fileRoom addition: Interior Remodel Of (E) Sfd With Addition At The Rear. Re-Stucco Existing House, Remodel Existing Kitchen And Bath, Change Windows To Like Size."Comply With Department Order Effective Date 08/18/2022. Permit Will Expire 30 Days From Issuance Date"
  • 2022
    permit on filePlumbing: New Plumbing Water Supply Lines

Manage this home to schedule a service or to update the timeline.