LAHomework Sign in
Los Angeles, CA 90272 · Iliff St

741 Iliff St

Built 1946 · 1,878 sq ft
LOT 6,474 SQ FT · 2 STRUCTURES · APN 4423-029-036Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1946
Living area
1,878 sqft
Lot size
6,474 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
4423-029-036

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 114 homes on Iliff St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPool: **2025 Wildfire Eligible Eo8 Project** (N) Swimming Pool With Spa
  • 2026
    permit on fileElectrical: 200Amp Temporary Power Pole
  • 2021
    permit on fileBathrooms: Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2021
    permit on file, unconfirmedElectrical: Bathroom Remodel, Non-Structural. Remove & Replace Sink, Light Fixture, Switches & Outlet. Replace Tub, Reduce Pony Wall. Replace Doors On Existing Linen To Match Cabinets. Add Shower Slider W/90 Degree Return At Pony Wall. Reuse Existing Showerhead/Handshower. Remove Fan/Heat Exhaust Replace W/Fan
  • 2021
    permit on file, unconfirmedPlumbing: Bathroom Remodel, Non-Structural. Remove & Replace Sink, Light Fixture, Switches & Outlet. Replace Tub, Reduce Pony Wall. Replace Doors On Existing Linen To Match Cabinets. Add Shower Slider W/90 Degree Return At Pony Wall. Reuse Existing Showerhead/Handshower. Remove Fan/Heat Exhaust Replace W/Fan
  • 2021
    permit on fileHeating & cooling: Bathroom Remodel, Non-Structural. Remove & Replace Sink, Light Fixture, Switches & Outlet. Replace Tub, Reduce Pony Wall. Replace Doors On Existing Linen To Match Cabinets. Add Shower Slider W/90 Degree Return At Pony Wall. Reuse Existing Showerhead/Handshower. Remove Fan/Heat Exhaust Replace W/Fan
  • 2014
    permit on file, unconfirmedPool: New Pool 10'6" X 23' And Spa 10'6" X 5 Per Std. Plan #268 · PACIFIC BLUE POOLS & SPAS
  • 2014
    permit on fileRoom addition: Add Attached Open Trellis Patio Cover(10'6" X 16') @ Rear Per Enginee · VAN LOKEREN CONSTRUCTION INC

Manage this home to schedule a service or to update the timeline.