LAHomework Sign in
Los Angeles, CA 91042 · Perigord Ct

7378 Perigord Ct

Built 2000 · 3,456 sq ft
LOT 16,975 SQ FT · 1 STRUCTURE · APN 2552-048-004Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2000
Living area
3,456 sqft
Lot size
16,975 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
2552-048-004

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2020 to 2030From build year 2000
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 13 homes on Perigord Ct →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2020
    permit on file, unconfirmedSolar: 0$ Final Fees Per Ab1414Plan Check For Roof Mounted Pv1 System Consisting Of 60 (Rec290Tp2) Modules, 60 (Se320) Optimizers, 2 Solaredge Inverters (Se11400H-Us & Se3800-H-Us), Connected To An Existing 200A Main Service Panel. Derated Main Breaker. System Size: 17.40Kw Dc, 15.20Kw Ac.
  • 2020
    permit on file, unconfirmedElectrical: Main Service Breaker Derate To 150A

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030