LAHomework Sign in
Downey, CA 90241 · Rio Hondo Pl

7359 Rio Hondo Pl

Built 1950 · 1,605 sq ft
LOT 8,205 SQ FT · 2 STRUCTURES · APN 6229-009-020Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
1,605 sqft
Lot size
8,205 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
6229-009-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 21 homes on Rio Hondo Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Electrical Service Panel Replacement: 125 Amps. Edison Must Verify And Confirm The Meter Location Before Work Commences.
  • 2026
    permit on file, unconfirmedSolar: Solarapp+ - Solar And Storage 6.97Kw And 17 Panels; Includes Energy Storage System 100 Lf From Property Line. Energy Storage Systems Shall Comply With Downey Municipal Code Section 9534.14, R328 Crc And 1207.11 Cfc.

Manage this home to schedule a service or to update the timeline.