LAHomework Sign in
Los Angeles, CA 90044 · W 126th St

720 W 126th St

Built 1923 · 1,179 sq ft
LOT 8,039 SQ FT · 2 STRUCTURES · APN 6117-015-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
1,179 sqft
Lot size
8,039 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6117-015-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 70 homes on W 126th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedElectrical: Changing One Meter To 2 Gang Meter On 718 W 126Th St To Also Service Addresses 720-720 1/2 W 126Th St. Ref #25041-70000-56825Total Connected Load Not To Exceed 400Amps"Comply With Department Order Effective Date09/29/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on file, unconfirmedElectrical: One New Sub Panel. Service Located On 718 W 126Th Stref #25041-70000-56819"Comply With Department Order Effective Date09/29/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on file, unconfirmedPlumbing: Jadu 1 Room, Kitchen And Bathroom"Comply With Department Order Effective Date09/29/2020. Permit Will Expire 30 Days From Issuance Date".
  • 2022
    permit on file, unconfirmedGeneral remodel: Convert Existing Garage Into An (Adu) Accessory Dwelling Unit With Patio Cover Addition.
  • 2022
    permit on file, unconfirmedRoom addition: Proposed 19'-10" X 16'-3" Addition Of A (305 Sq. Ft.) Accessory Dwelling Unit Per Lamc 12.22 A.33(C) And (E) And 11'-4" X 11'-8" Addition Of A (115 Sq. Ft.) Bedroom To The (E) Single Family Dwellng.

Manage this home to schedule a service or to update the timeline.