LAHomework Sign in
Los Angeles, CA 90026 · E Edgeware Rd

720 E Edgeware Rd

Built 1926 · 1,802 sq ft
LOT 8,563 SQ FT · 2 STRUCTURES · APN 5405-024-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
1,802 sqft
Lot size
8,563 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5405-024-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 48 homes on E Edgeware Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: New 230V Circuits For Heat Pump System & Ev Charger.
  • 2024
    permit on file, unconfirmedElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2024
    permit on fileElectrical: New 230V Electrical Circuits For New Heat Pump System.
  • 2024
    permit on file, unconfirmedSolar: Installation Of A Roof-Mounted Central/String Inverter Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Central/String Inverter Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Central/String Inverter Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2024
    permit on fileHeating & cooling: Install New Heat Pump System.
  • 2024
    permit on fileHeating & cooling: Install New Heat Pump System.
  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing ___(8)___Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Lab
  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Sheathing ___12___Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled A

Manage this home to schedule a service or to update the timeline.