LAHomework Sign in
Los Angeles, CA 90063 · N Gage Ave

718 N Gage Ave

Built 1915 · 2,536 sq ft
LOT 6,433 SQ FT · 2 STRUCTURES · APN 5230-019-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1915
Living area
2,536 sqft
Lot size
6,433 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
2
Home type
Fourplex (4 units)
Parcel (APN)
5230-019-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 139 homes on N Gage Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Attached Adu: Conversion Entirely Within Existing Mfr 1600Sf. New Adu 700Sf With (02) Beds W/Closet And (01) Bath W/Shower. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.
  • 2023
    permit on fileHeating & cooling: Mechanical For Attached Adu: Conversion Entirely Within Existing Mfr 1600Sf. New Adu 700Sf With (02) Beds W/Closet And (01) Bath W/Shower. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.
  • 2023
    permit on fileHeating & cooling: Mechanical For Conversion Entirely Within Existing Mfr 1600Sf. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.
  • 2023
    permit on filePlumbing: Plumbing For Attached Adu: Conversion Entirely Within Existing Mfr 1600Sf. New Adu 700Sf With (02) Beds W/Closet And (01) Bath W/Shower. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.
  • 2023
    permit on filePlumbing: Plumbing For Conversion Entirely Within Existing Mfr 1600Sf. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.
  • 2023
    permit on fileElectrical: Electrical For Attached Adu: Conversion Entirely Within Existing Mfr 1600Sf. New Adu 700Sf With (02) Beds W/Closet And (01) Bath W/Shower. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.
  • 2023
    permit on fileElectrical: Electrical For Conversion Entirely Within Existing Mfr 1600Sf. *Provide Details On How 1 Hour Separation Will Be Maintain Between Adu And Sfd From Foundation To The Bottom Side Of Roof Sheathing.

Manage this home to schedule a service or to update the timeline.