LAHomework Sign in
Altadena, CA 91001 · Ventura St

716 Ventura St

Built 1922 · 2,484 sq ft
LOT 13,522 SQ FT · 2 STRUCTURES · APN 5823-020-025Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
2,484 sqft
Lot size
13,522 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5823-020-025

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2019
Expected 2039 to 2049From the 2019 permit
HVACOn record 2019
Expected 2034 to 2039From the 2019 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 137 homes on Ventura St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileSolar: Installing 5.04Kw Photovoltaic System 14 Panels 1 Inverter 1 Battery Back Up Main Breaker Derate 125 To 100Amp
  • 2021
    permit on fileSolar: • System Size: 8640W Dc, 9800W Ac • Modules: (24) Longi Green Energy Technology Co Ltd: Lr4-60Hph-360M • Inverters: (1) Solaredge Technologies: Se7600H-Uss3 • Energy Storage System: (1) Lg Chem: Resu 10H Prime • Main Breaker Derate: Replace Existing 125A Main Breaker With New 100 Amp Main Breaker.
  • 2021
    permit on fileElectrical: • Energy Storage System: (1) Lg Chem: Resu 10H Prime 125A Subpanel Related To Unc-Solr210723002327
  • 2021
    permit on fileElectrical: Lg Chem Resu 10H Prime Battery, 125A Subpanel. Related To Unc-Solr210720002260.
  • 2019
    permit on fileRoof: Tear Off Existing On House Only 1500 S.F. And Reroof Install Shingles Class A.
  • 2019
    permit on fileKitchen: 1 Bathroom Remodel, New Laundry Room, Relocating Kitchen, Adding 2 Closets. No Structural Changes, No New Window Or Doors No Additional Sf.
  • 2019
    permit on fileHeating & cooling: Mechanical For 1 Bathroom Remodel, New Laundry Room, Relocating Kitchen, Adding 2 Closets. No Structural Changes, No New Window Or Doors No Additional Sf.
  • 2019
    permit on fileElectrical: Electrical For 1 Bathroom Remodel, New Laundry Room, Relocating Kitchen, Adding 2 Closets. No Structural Changes, No New Window Or Doors No Additional Sf.
  • 2019
    permit on filePlumbing: Plumbing For 1 Bathroom Remodel, New Laundry Room, Relocating Kitchen, Adding 2 Closets. No Structural Changes, No New Window Or Doors No Additional Sf.
  • 2019
    permit on fileRoom addition: Permit Garage 1200 S.F. And Adu 1200 S.F. 2 Bedrooms And 1 Bath.
  • 2019
    permit on fileElectrical: Electrical For Garage, New Adu, 200 Amps Main Service Panel And 100 Amp Sub-Panel.
  • 2019
    permit on filePlumbing: Plumbing For New Adu.
  • 2019
    permit on fileHeating & cooling: Mechanical For New Adu.
  • 2019
    permit on fileGeneral remodel: Replace Exterior Siding On Main House.
  • 2018
    permit on fileElectrical: Remodel Kitchen And Bathroom, Rewire House And Upgrade Main Srvice Panel To 200 Amps.
  • 2018
    permit on filePlumbing: Remodel Bathroom And Kitchen.
  • 2018
    permit on fileHeating & cooling: Remodel Bathroom And Kitchen.
  • 2018
    permit on fileElectrical: Temporary Power Pole

Manage this home to schedule a service or to update the timeline.