LAHomework Sign in
Los Angeles, CA 91405 · Colbath Ave

7120 Colbath Ave

Built 1953 · 1,331 sq ft
LOT 7,184 SQ FT · 1 STRUCTURE · APN 2216-007-002Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
1,331 sqft
Lot size
7,184 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2216-007-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 98 homes on Colbath Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing _24_ Squares. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roofing Rating Council (Crrc). Cool Roof May Be Required For Non
  • 2025
    permit on fileRoom addition: Interior Remodel To (E) Sfd. Convert Portion Of (E) Bathroom Into (N) Bathroom. Convert (E) Att. Garage To Junior Accessory Dwelling Unit Per Gc 66323(A)(1) And 66333. All Work Per Engineer."Comply With Department Order Effective Date 08/20/2025. Permit Will Expire 30 Days From Issuance Date"
  • 2025
    permit on fileElectrical: Upgrade Main Service To 200 Amp / 2 Meter Gang."Comply With Department Order Effective Date 08/20/2025. Permit Will Expire 30 Days From Issuance Date"
  • 2025
    permit on filePlumbing: Replace (1) Hose Bib."Comply With Department Order Effective Date 08/20/2025. Permit Will Expire 30 Days From Issuance Date"
  • 2016
    permit on file, unconfirmedElectrical: Electrical Permit · ARMTECH SOLUTIONS INC

Manage this home to schedule a service or to update the timeline.