LAHomework Sign in
Glendale, CA 91206 · Glen Ave

701 Glen Ave

Built 1957 · 2,658 sq ft
LOT 7,987 SQ FT · 1 STRUCTURE · APN 5665-010-011Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1957
Living area
2,658 sqft
Lot size
7,987 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5665-010-011

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 19 homes on Glen Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileWater heater: Change Out Of 50 Gal Water Heater In The Garage In Same Location.
  • 2018
    permit on fileElectrical: One 101-200 Amp Service
  • 2018
    permit on fileBathrooms: (2) Bathroom Remodel Drywall And Insuallation In Bathrooms No Exterior Changes And No Movement Of Walls
  • 2002
    permit on fileRoof: Material: Rock Class A - No. Of Squares: 30 Sqs. - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: Two - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheat

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2022 to 2032