LAHomework Sign in
Los Angeles, CA 91406 · Lasaine Ave

7001 Lasaine Ave

Built 1951 · 1,124 sq ft
LOT 7,479 SQ FT · 2 STRUCTURES · APN 2228-029-030Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1951
Living area
1,124 sqft
Lot size
7,479 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
2228-029-030

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 129 homes on Lasaine Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedRoom addition: Convert Existing Two Car Garage Into Accessory Dwelling Unit As Per Lamc 12.22 A.33 (C) And (E) , Add New Sfd Per Sb9 Unit , Remove Existing Patio Cover, Nfpa-13D Fire Sprinklers Throughout, All Work Per Engineering
  • 2021
    permit on file, unconfirmedElectrical: Relocate Pool Equipment
  • 2020
    permit on filePool: Re-Plaster Existing Swimming Pool. "Comply With Department Order Effective Date03/18/2020. Permit Will Expire 30 Days From Issuance Date"
  • 2020
    permit on fileRoof: "Comply With Department Order Effective Date 03/18/2020. Permit Will Expire 30 Days From Issuance Date". Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Overexisting Solid Sheathing 28 Squares. For Residential Roof Replacement ≫ 50% Ofthe Total Roof Area, Apply Cool Roo
  • 2020
    permit on fileWater heater: Replace Water Heater

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035